I understand that Foster School is next to wetlands and in a flood zone. What will be done to mitigate the risk of flooding and protect the environmentally sensitive areas surrounding the school?

Foster School is located on a thirty-nine acre parcel of land, most of which consists of various ecosystems, which will provide a rich outdoor learning experience for students. The site also includes several constraints, including wetlands, a steep hillside, tidal marsh and flood zone area. The SBC believes that its preferred option, chosen from among 10 different possibilities after months of consideration, is the best option for taking full advantage of the natural elements of the site while also minimizing the impact to the surrounding natural areas. The proposed design faces south, which takes advantage of the southern sun exposure and views of the marsh. The preferred option chosen by the SBC addresses the projected 2070 flood zone concerns by raising the grade of the Foster School site several feet above the current level of most of the existing site. This raised grade will place the new school above the the projected 2070 storm surge flood plain level. 

Show All Answers

1. What is the Foster School Building Project?
2. What is the Foster School Building Committee?
3. What is the MSBA?
4. What is the benefit of working with the MSBA?
5. How is our community included in this process?
6. What are the different phases of the project and how long will each phase, including construction, take?
7. What is the value of rebuilding the Foster School to people who either don’t live in the Foster district or don’t have children in the Hingham Public Schools?
8. When will the construction start and end? When would students be in the new school?
9. My child is at Foster. Will he/she need to move to a different school during construction?
10. What will happen to the athletic fields and tennis courts during construction?
11. Was a traffic study done? How will traffic be managed during construction?
12. How was the enrollment number determined? Does the new enrollment number allow for growth?
13. What is the potential base reimbursement rate from the MSBA for this project? How was the rate determined?
14. How will this new building support Hingham’s climate action planning efforts and the Town’s goal of reducing our fossil fuel use and carbon emissions?
15. I understand that Foster School is next to wetlands and in a flood zone. What will be done to mitigate the risk of flooding and protect the environmentally sensitive areas surrounding the school?