The Weir River Water System would like to notify Hingham Residents of a main repair being performed at the section where Rosemary Lane meets Main Street. Although we do not anticipate any loss of pressure or discoloration of water, there is always a potential for it. Crews are on site. The work should take from 6 to 8 hours to complete.